OnlineNursingOwl
← All nursing posts

Engineering · SweetStudy

Cost load an XER project file using the cost from SOV file , both files are attached on here but key note don't change logic or dates on the baseline schedule .

Overview

 Cost load an XER project file using the cost from SOV file , both files are attached on here but key note don't change logic or dates on the baseline schedule .