Overview
Cost load an XER project file using the cost from SOV file , both files are attached on here but key note don't change logic or dates on the baseline schedule .
Engineering · SweetStudy
Cost load an XER project file using the cost from SOV file , both files are attached on here but key note don't change logic or dates on the baseline schedule .